Project Info

GSA Yates Building

The facilities staff at the Yates Building was looking for ways to improve the energy efficiency of the building, particularly due to the Visitors Center and National Fire Center (NFC) being open outside of the normal office hours of the rest of the building’s occupants. Maintaining temperature control for these two areas required the entire building’s Heating, Ventilating, and Air Condition (HVAC) system.

As a means to save energy, the facilities staff wanted to isolate the HVAC for the Visitors Center and NFC so the entire building’s system wouldn’t need to be operating in order to maintain temperature for these two areas.

Washington DC
District of Columbia
Click images below to make larger.

Restoration Trades DirectoryRestoration Trades Directory

Meetinghouse Enterprises      189 Bridge St      Northampton, MA 01060      Email: results@restorationtrades.com

Copyright © Custom Building and Restoration Trades Directory

Sponsored by The Guild of Building Artisans

Register to add your company to this listing.